Saturday, September 27, 2014

Summer Quilt

I am visiting my parents.  Mum has a different bed quilt for each of the seasons.  This is her summer quilt.  I quilted it for her using my handi quilter sweet sixteen sit down machine.





I did some lovely work 7 years ago! 

Tuesday, September 23, 2014

We're Waiting......





In July I was invited to join the WonderFil Specialty Threads team and set up and manage a Handi Quilter Rental Studio and write and publish a variety of newsletters for WonderFil Specialty Threads. There will be two of us looking after the Threaducation Centre and the Rental Studio. Come by for a visit!



We'll have 2 HQ Avantes; these are 18" machines on 12 foot tables. 













We'll have a ProStitcher on one of the Avantes; a computer system for quilting.








We'll have 2 Sweet Sixteen sit down models.













To rent, you will be required to take a 2-3 hour certification course to learn how to use these fabulous machines. Once certified, you can rent machines.....Aren't you excited?

The studio is very empty....but soon, we'll have the walls covered in quilts and the floors full of machines!


Our Classroom Space doesn't look like much yet, but we'll get lots of inspiration up on the walls soon!


Look at all these threads you can us
e!   

Friday, September 19, 2014

quilt retreat in Trail BC.

It's been a great week. I feel like I've accomplished a lot.  I have COMPLETELY FINISHED my Arabesque quilt.  I finished quilting it at home. Came to retreat and trimmed and bound it.

I completed my Winter Ice quilt top.  Had to sew 4 blocks, get them into the top and add the border.  The quilt measures 113 x 113 inches. ...that's 12 meters of faux piped binding already to go.   I've found that I need to make the binding when I make the top, otherwise I loose or use the fabric.

We went to the States on Wednesday and I bought some fabric for my HST sampler quilt.  Calling this Entwined Swoon.  The quilt top uses 2 sizes of Half Square Triangles which will be a great teaching sample for guild in two weeks.

Now to spend the rest of our last day working on some mini trips blocks.

Tuesday, September 16, 2014

sewing in Trail BC

I've had a busy week.  I've joined a group of ladies at a quilting retreat.  We are getting quite a bit accomplished.

Wednesday, September 3, 2014

Arabesque....quilting

Gonna get this done today if possible....but for sure by the weekend.